Willesden Substation Cables
Client: JSM Group Services Ltd
Location: England
Year completed: Ongoing
Services: detailed design



We were appointed by JSM to design support brackets to 4 new trefoil cable routes through the bridges and tunnel system at Willesden substation.
The work includes setting out the new cables in 3D to avoid existing equipment. We carried out an inspection of the route which is in a confined space to scope out the preferred alignment and investigate support options.
We will carry out the detailed design of support brackets to fix to existing support steel sections, existing halfen type channel system or direct fixing to the floor or walls.