The Malaysia-Singapore HSR will connect 6 cities, following a 335km coastal route with trains travelling at a design speed of 300kph that will cut travel time between Kuala Lumpur and Singapore to 90 minutes. The stations that have currently been identified are the terminus station in Kuala Lumpur (at Bandar Malaysia), Putrajaya, Seremban, Ayer Keroh, Muar, Batu Pahat, Iskandar Puteri and the final stop in Singapore.
Hewson Consulting will be working alongside our Kuala Lumpur based sister company H&T Associates to support AECOM with the reference design for the HSR bridges and viaducts for the section from Iskandar Puteri Station to the International Border between Malaysia and Singapore, including the straits crossing.
