Liantang / Heung Yuen Wai Highway Contract 6
Client: CRBC-CEC-KADEN Joint Venture
Location: Hong Kong
Year completed: 2019
Services: Independent Cat III check, inspection



The Contract CV/2013/08 Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 6 covers 4.6km long dual two-lane connection road which includes 3.3km of viaducts, 0.7km of tunnel and 0.6km of at- grade roads. It connects the Sha Tau Kok Road with the new Boundary Control Point.
We were appointed to carry out the independent checking for the contractor’s alternative design of permanent works which include prestressed precast segmental viaducts, tunnel portal site formation, retaining walls, foundation of tunnel ventilation buildings and various other civil structures.
We were also responsible for checking the temporary works design and method statements related to the bridge construction which features the use of balanced cantilever method by lifting frames and cranes.