TM-CLK Link – Northern Connection Toll Plaza
Client: CRBC-KADEN Joint Venture
Location: Hong Kong
Year completed: 2019
Services: Independent Cat III check, inspection



The Contract HY/2013/02 TM-CLK Link – Northern Connection involves the construction of a new highway toll plaza of approximately 5.4 hectares and associated bridge structures, carriageways and footbridge, as well as modification and realignment of sections of Lung Mun Road and Lung Fu Road at Tuen Mun, and associated works.
We are appointed to carry out the independent checking for the contractor’s alternative design of permanent works which include prestressed box girder viaducts, prestressed beam-and-slab bridges, retaining walls and various other civil structures.
We were also responsible for checking the temporary works design and method statements related to the bridge construction which features the use of balanced cantilever method by form travellers.
