Tideway Topping Out

HomeBlogNewsTideway Topping Out

Tideway Topping Out

28 November 2023

The main shaft on the west section of London’s Tideway super sewer project has been topped out with the precast units that we designed on behalf of the BMB Joint Venture.  Our complete re-design of the upper shaft structures to adopt a “top down” approach using DfMA (off site) techniques has resulted in significant time and cost savings for the project.

Read more about this project here.