Blog

Our Carnwath Road shaft redesign for Thames Tideway in the news

Our Carnwath Road shaft redesign for Thames Tideway in the news 26 September 2024 Our Thames Tideway Carnwath Rd shaft redesign for BMB JV on behalf of Tideway London has been featured in Ground Engineering Magazine online, ahead of our director Andrew Hodgkinson’s presentation on how precast solutions were utilized to shave 6 months off the build […]
Continue Reading

Goodbye (until next time!) to our 2023/2024 student cohort …

Goodbye (until next time!) to our 2023/2024 student cohort … 9 September 2024 We’ve said goodbye to all our 2023/2024 year placement and 2024 summer placement students, and we wish them all the best as they head back to Uni! They were all thrown in the deep end, working on interesting and challenging projects around […]
Continue Reading

Student Site Visits

Student site visits 31 July 2024 Understanding how structures are built is essential to being able to design them, and site visits play an important part in this learning process for the students that join us for placements each year.  Recently our young engineers were welcomed by Skanska Costain STRABAG JV and Balfour Beatty Plc […]
Continue Reading

2024 Engineering Challenge

2024 Student Engineering Challenge 31 July 2024 Three teams of our graduate and student engineers competed in our annual Engineering Challenge recently.   The brief was to create a section of a cantilevered stadium roof which could support a PA system, using only paper and split pins, with two bricks for ballast. The Challenge is designed […]
Continue Reading

Heather Smith

Herrington Editor Post Blog

Cras ac porttitor est, non tempor justo. Aliquam at gravida ante, vitae suscipit nisi. Sed turpis lectus tellus bibendum viverra.

Categories

Latest Posts

Subscribe Newsletter

Sign up to receive notifications about the latest news and events from us!