Water

Eagle Pond Flood Protection Works

Eagle Pond is a 40,000m3 reservoir retained by a 4m high dam in east London, built prior to 1745. Being in an urban area, the reservoir is considered to be high risk in terms of consequence of failure. The project was to implement a recommendation in the interests of safety, from a Section 10 inspection […]
Continue Reading

Aylesbury Canal Basin Improvement

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Proin tincidunt tellus sed nisi accumsan vestibulum. In hac habitasse platea dictumst. Fusce ac lacinia quam. Phasellus aliquet ut nulla et condimentum. Proin posuere sem.
Continue Reading

Heather Smith

Herrington Editor Post Blog

Cras ac porttitor est, non tempor justo. Aliquam at gravida ante, vitae suscipit nisi. Sed turpis lectus tellus bibendum viverra.

Categories

Latest Posts

Subscribe Newsletter

Sign up to receive notifications about the latest news and events from us!